Our Projects
At Uday Structurals & Engineers Pvt. Ltd., we pride ourselves on successfully executing a wide array of challenging and prestigious projects across various sectors. From luxury hotels and corporate parks to residential complexes and specialized structures, our commitment to quality, innovation, and customer satisfaction has been the cornerstone of our success. Below is an overview of some of our notable projects that highlight our expertise and dedication to excellence.

01
Hotel Marriott Courtyard, Andheri, Mumbai
Uday Structurals & Engineers Pvt. Ltd. successfully completed the construction of the Hotel Marriott Courtyard in Andheri, Mumbai. The project included the design and erection of a triple height entrance lobby, providing a grand and welcoming space for guests. Our advanced formwork systems ensured precision and efficiency, meeting the high standards required for this prestigious hotel.
02
Air Traffic Control Tower, Mumbai Airport
UDAY was tasked with designing, supplying, and installing cuplock access scaffolding with staircase towers for Mumbai's newest landmark, the Air Traffic Control Tower at Mumbai Airport. The unique structure, featuring a 16-meter cantilever at 60 meters height, required innovative scaffolding solutions. Our expert team delivered a custom design that ensured safety and stability throughout the construction process.

03

Solitaire Corporate Park, Andheri-Chakala
For the Solitaire Corporate Park project in Andheri-Chakala, UDAY provided comprehensive scaffolding and formwork solutions. This included the use of various scaffolding systems to ensure the safety and efficiency of construction activities across multiple high-rise buildings. Our commitment to quality and precision was evident in the seamless execution and timely completion of the project.
04
Taj Lands End, Mumbai
UDAY provided specialized scaffolding and formwork solutions for the renovation of Taj Lands End, a luxury hotel in Bandra, Mumbai. The project involved complex structural renovations and enhancements to maintain the hotel’s iconic status. Our solutions ensured minimal disruption to hotel operations, showcasing our ability to deliver high-quality results in challenging environments.

05

Hotel Leela Palace, New Delhi
For the luxurious Hotel Leela Palace in New Delhi, UDAY delivered custom formwork solutions tailored to the unique architectural requirements of this five-star hotel. The project involved intricate formwork designs to support the construction of elegant and complex structural elements, ensuring a superior finish that aligns with the hotel's luxurious standards. Our expertise in formwork engineering contributed to the successful and timely completion of this prestigious project.
Our Scaffolding & Formwork Projects

.jpeg)

01
Climbing Formwork system for Retaining Walls :
Climbing Formwork System for Retaining Walls with tapering height upto 18.0 Mtr and Counterforts at regular distance, was supplied to an industrial project in Goa.

02
Climbing Formwork system for Retaining Walls :
This aluminium panel Climbing Formwork was supplied to a high rise building project at Mumbai.
03
Turnbuckles :
Turnbuckles of various dimensions and applications are supplied as per clients requirements. This giant turnbuckle of 250 Ton capacity was supplied for precast bridhe segment Launcher for Mumbai Sea Link Project.


.jpeg)


04
Slab Drop Head Shuttering System :
Slab shuttering with Early Striking Drop Head System was supplied for a Mumbai Airport Project for upto 450 mm slab thickness and shuttering removable after 3 -4 days after slab casting resulting in quick rotation of shuttering materials for faster construction progress.




.jpeg)


.jpeg)
.jpeg)
.jpeg)
05
Staircase Scaffolding:
Staircase Scaffolding in Cuplock or Ringlock Scaffolding System is an ideal choice for access to any location conveniently and safely.
.jpeg)


.jpeg)
.jpeg)

.jpeg)

06
Aluminium Scaffolding and Mobile Towers :
Aluminium Scaffolding and Mobile Towers are supplied as per clients height and access requirements in straight or cantilever towers for height ranging from 2.0 Mtr till 50.0 Mtr.
.jpeg)
.jpeg)


.jpeg)

07
Climbing Lift Shaft Platforms :
These crame handled Climbing Lift Shaft Platforms are extremely safe and economical for working in lift shafts, large or small size for construction of shaft walls. It can be conveniently taken up next floor level by tower crane safely thanks to its unique spring activated locking mechanism.

.jpeg)
08
Steel Fabrication for Bridge Girders or Large Span Trusses :
Pre Fabricated Steel Bridge Girders and Large Span Industrial Truss Fabrication is conveniently carried out at our top class works meeting all industry standards and requirements.
09
Pre Engineered PEB Buildings :
We design Pre Engineered PEB and ready to install building structures for any office or industrial buildings. Above photo of Pre Engineered Office and Canteen Building supplied and installed at US Embassy at Naukchott , capital city of Mauritania.





.jpeg)
.jpeg)


.jpeg)
.jpeg)
10
Tunnel Formwork Gantry:
Tunnel Formwork Gantries with Hydraulic operation for various tunnel projects in Metro Rail , Highways or Power Projects, are supplied ensuring quality and safety standards in most optimum budgets.
.jpeg)



11
Extreme Fabrication Projects :
Extreme Engineering Projects requiring highest Safety and Quality requirements and technical competance are executed within clients timelines and cost parameters.